The Water Damage Estimate Starts Before You Open Xactimate 

By: Nelson Higgins

Facebook
Twitter
LinkedIn
Print

The average estimator in the United States spends 30 minutes to an hour writing a $10,000 estimate. That number surprises people. It shouldn’t. What happens before the estimate is opened determines the outcome far more than the estimating itself. 

Most payment delays in water damage trace back to a bad file: 

  • Scope that wasn’t confirmed. 
  • Documentation that was incomplete. 
  • A carrier who sees a bill that doesn’t match what was captured on site. 

By the time the estimate is written, the result is already shaped by what happened on day one. 

Scope alignment comes first. 

The scope of work is the foundation every job is built on. If you and the adjuster don’t agree on what’s damaged, pricing can’t follow. If pricing is wrong, approval stalls. If approval stalls, payment doesn’t come. I’ve watched this chain break at the same point for 45 years: the scope. 

A signed, agreed-upon scope isn’t a formality. It’s what makes the estimate defensible. Write one line item on a job where scope was never confirmed, and you’ve already set yourself up for a dispute at the end. 

Documentation has to tell the whole story. 

A photo shows what you pointed the camera at. Nothing more. If water traveled 15 feet from the source through a subfloor, a photo won’t show that. If pre-existing damage was present when you walked in, a photo may not capture enough context to protect you six months later. 

360 tours document the whole room: every angle, every condition, everything present at the time of capture. On a water mitigation job, the ideal file has a day-one walkthrough, a post-demo capture, and equipment documentation. That three-step timeline gives an estimator everything they need to write accurately, and gives a carrier everything they need to approve without questions. 

The difference shows up in cycle time.. When documentation is complete and scope is confirmed from day one, that cost comes down and estimates move faster.  

The estimate reflects the file you built. 

Writing an estimate efficiently is possible when the file is complete: 360 documentation, scope confirmed, materials specified, equipment listed. The estimator is translating a complete record into line items, not filling in gaps. 

When that file is incomplete, the time goes up. Questions go back and forth. Carriers push back on charges that aren’t supported. What should be a fast approval becomes a 60-day wait. 

The contractors who get paid fastest build the file correctly before the estimate is ever written. Scope first. Documentation complete. Everything in the record that needs to be there. 

The estimate is the last step. Make sure everything before it is done right.

Nelson Higgins

Nelson is the Vice President, North America at DocuSketch. Prior to DocuSketch, Nelson was the founder and COO of XTR Consulting Inc. His home base is in Halifax, NS, Canada, but he covers projects throughout North America. He currently holds an XCT (Xactimate Certified Trainer) certificate and has held this designation for over 10 years. With more than 35 years of experience in the insurance industry from both the contractor and adjuster perspectives. He is experienced in all aspects of scoping and estimating property damages of residential and commercial buildings and has been involved in completing estimates and projects of all sizes through completion. He has gained a vast amount of knowledge on leveraging new technologies to help clients with in-depth documentation and the cycle of a claim.

Read More